Home Page
About Us Page
Links Page
Contact Us Page
Forums Page
Users Pages
Guestbook Page
Search Site Page
Project Page
 
Home | Profile | Active Topics | Active Polls | Search | FAQ
Username:
Password:
Save Password
Forgot your Password?

 All Forums
 Main Area
 World Ham Chat Area
 TX5C

Note: You must be registered in order to post a reply.

Screensize:
UserName:
Password:
Format Mode:
Format: BoldItalicizedUnderlineStrikethrough Align LeftCenteredAlign Right Horizontal Rule Insert HyperlinkInsert EmailInsert Image Insert CodeInsert QuoteInsert List Spell Checker
   
Message:
* HTML is OFF
* Forum Code is ON
Smilies
Smile [:)] Big Smile [:D] Cool [8D] Blush [:I]
Tongue [:P] Evil [):] Wink [;)] Clown [:o)]
Black Eye [B)] Eight Ball [8] Frown [:(] Shy [8)]
Shocked [:0] Angry [:(!] Dead [xx(] Sleepy [|)]
Kisses [:X] Approve [^] Disapprove [V] Question [?]

  Check here to include your profile signature.
Check here to subscribe to this topic.
    

T O P I C    R E V I E W
vk3pa Posted - 07 Mar 2008 : 09:35:42 AM
have landed on nth side es setting up
3   L A T E S T    R E P L I E S    (Newest First)
vk3pa Posted - 09 Mar 2008 : 08:13:03 AM
March 8th
Turns out it was very much yesterday today than it was the day before. The clouds that were present at dawn disappeared by 7am allowing for the full force of the south pacific sun to express itself. By 10:30am, it was 110 degrees at our base camp and hotter at the CW station. The heat has compounded our work load and Arnie, N6HC had his hands full dealing with sunburns and mandatory work and water breaks every 30 minutes to ensure each team member's safety. By 1pm the heat was so intense our work pace drew to a crawl. With safety being our main concern, we cut back our work loads until it was bearable later in the day to resume. By mid afternoon, some cloud appeared and we were able to continue erecting our antennas and complete our operating stations. Both the cw and ssb camp are very near completion. the few antennas remaining to be erected at daybreak.

We are approximately 24 hours behind our intended schedule, but believe now that the majority of the work is behind us with the remaining antenna erection to be completed at daybreak while temperatures are bearable. We anticipate being on the air with both CW and SSB stations by midday.

At 1800z, we're very close to coming on the air.

vk3pa Posted - 08 Mar 2008 : 07:11:55 AM
March 7th UTC
As dawn broke over Clipperton Atoll, our team is already beginning to put the final touches on our camps. It is a bit hotter this morning than yesterday but the breeze seems to be building. Our main challenge continues to be the heat and humidity as with most south pacific dxpeditions. We are committed to having our CW and SSB stations operational sometime today and will be on the air most likely starting this evening.
vk3pa Posted - 07 Mar 2008 : 12:44:44 PM
Today 6th has been very busy under challenging conditions. It is extremely hot and we are quite aware of the dangers extreme heat can bring. Hence, our number one concern is the health and safety of our team members. Yet, we have completely unpacked all our equipment from Shogun and moved all the gear off the beach and into the two operating camps. We have spent the day constructing our two operating camps, CW and SSB. The CW camp is nearly finished, the SSB camp should be finished tomorrow.

..stay tuned.


Goldfields DX Amateur Radio Group © 2002 - 2022 Goldfields DX Amateur Radio Group Go To Top Of Page
This page was generated in 0.95 seconds. Snitz Forums 2000